The North West Grid 400 kV Nyakanazi–Kigoma Transmission Line is a major electricity-transmission project in north-western Tanzania designed to connect the Kigoma area more fully to the national grid. Its core infrastructure comprises approximately 280 km of 400 kV double-circuit line between Nyakanazi and Kidahwe near Kigoma, associated substations and distribution-network integration.
The project is intended to improve the reliability and affordability of electricity in Kigoma Region, reduce reliance on costly diesel generation in Kigoma and Kasulu, and facilitate evacuation of electricity from regional generation assets, including renewable-energy projects. It forms part of the wider North West Grid programme linking Nyakanazi, Kigoma, Mpanda, Sumbawanga, Tunduma and Mbeya.
Implementation remains ongoing. Tanzania’s Ministry of Energy reports the transmission line at 99% completion and the associated Nyakanazi and Kigoma substations at 29.33%. The African Development Bank published its latest implementation progress report on 3 June 2026.
Key project information
- Official name
- North West Grid 400 kV Nyakanazi–Kigoma Transmission Line
- Status
- Ongoing
- Current phase
- Construction / implementation
- Country
- Tanzania
- Location
- Nyakanazi–Kigoma corridor · Kagera and Kigoma regions
- Sector
- Energy
- Sub-sector
- Electricity transmission
- Project structure
- Sovereign public infrastructure project
- AfDB project ID
- P-TZ-FA0-013
- RicherFin project ID
- 055cd0dc-d67b-419f-9387-2a55f9f1ac06
- Estimated cost at appraisal
- US$186.12 million
- Approval date
- 20 Jul 2018
- Expected completion
- 30 Jun 2027
- Voltage
- 400 kV
- Transmission-line length
- Approximately 280 km
Financing
At appraisal, project cost was estimated at US$186.12 million. The financing plan comprised a US$123.39 million African Development Bank loan, approximately 66% of cost; US$44.19 million from Korea’s Economic Development Cooperation Fund, approximately 24%; and US$18.54 million from the Government of Tanzania, approximately 10%.
The current AfDB project record reports total project cost of UA131.69 million and AfDB financing of UA87.31 million. The original US-dollar appraisal figures are retained as the baseline financing structure rather than being reconciled with later reporting without an explicit institutional revision.
- Total project cost
- US$186.12 million at appraisal
- AfDB financing
- US$123.39 million at appraisal
- Korea EDCF financing
- US$44.19 million at appraisal
- Government of Tanzania contribution
- US$18.54 million at appraisal
- Financing structure
- Sovereign debt · development finance · government counterpart funding
Continue to project details
Sign in to continue with the complete project information.
Sign in to continue