Sovereign Project
Operation of the drinking water supply systems (SAEP) of the Notto perimeter - Diosmone - Palamarin and Fatick
Senegal
Water and sanitation · PPP
Estimated cost2.1bn XOF
Project structurePPP
Sponsor / contactOFOR
OFOR
Senegal
Description
Operation of hydraulic infrastructure of the Noto Diasmone Palamarin transfer system and Fatick region (NDP/F).
- Status
- P2
- Last update
- 14 Aug 2026
Request Access→Access additional project documents and information.
Request Introduction→Request an introduction to the sponsor or relevant public authority.
Country IntelligenceNot available on your current plan.