Sovereign Project

Kenya - Thwake Multi-purpose Water Development Program – Phase I

Kenya · {'name': 'Kitui', 'coordinates': '-1.835 38.451'}, {'name': 'Makueni', 'coordinates': '-2.222 37.872'}

Water sector policy and administrative management · Public investment / AfDB sovereign financing

Estimated cost179.3m XDR
Financing soughtAfDB sovereign financing approved
Project structurePublic investment / AfDB sovereign financing
Target date2027-07-31
Sponsor / contactMinistry of Water Development

Ministry of Water Development
RDGE

Kenya

Description

The present intervention focuses on the first phase of the The Thwake Multi-purpose Water Development Program (TMWDP). This intervention comprises a multi-purpose dam for water supply, hydropower generation and irrigation development. It will also provide regulation of flows on Athi River downstream of the dam for flood and drought mitigation. The TMWDP targets broad improvement in productivity and livelihoods over a ten-year period, ending 2023. In phase 1, the program will increase water security by providing 681 million cubic metres (MCM) of water storage, earmarked for phases 2, 3 and 4 as follow: 34 MCM for human consumption, 625 MCM for double usage (power generation and downstream irrigation), 22 MCM for upstream irrigation, and an allocation for downstream conservation flow. The main expected outcomes are increased water security within the zone of influence of the dam, a firmer foundation for the development of cross-sectorial approaches to water management, and reduction in risk factors by increasing capacity for flood and drought related disaster preparedness.

Status
Ongoing
Last update
14 Aug 2026
Source
African Development Bank Group · IATI
Actions
Request AccessAccess additional project documents and information. Request IntroductionRequest an introduction to the sponsor or relevant public authority. Country IntelligenceNot available on your current plan.