Construction of EPC Roads — Lot 6, WCR Urban Links — Gambia
Gambia · West Coast Region · Transport
Overview
Lot 6 of the West Coast Region EPC roads is a public road project covering three routes between urban and peri-urban communities south of the Banjul conurbation. The Government of The Gambia reports approximately 28 km across the Youna–Jambur–Jalangbang–Brikama, Jambur–Baniaka–Kunkujang–Tujereng and Old Yundum–Tawto–Jabang links.
Works include road construction and associated drainage, street lighting, signage, road-safety equipment and guardrails. The project is intended to improve connectivity, travel conditions and road safety in the West Coast Region.
The government portal reports 80% completion and a July 2026 estimated completion date. As that date has passed while the project remains listed at 80%, no replacement completion date is stated without an updated official schedule.
Key project information
- Official name
- Construction of EPC Roads (Lot 6-WCR Urban Links)
- Status
- Under construction · 80% complete
- Current phase
- Construction
- Country
- The Gambia
- Location
- West Coast Region
- Sector
- Transport
- Sub-sector
- Road infrastructure
- Project structure
- Engineering, Procurement and Construction
- RicherFin project ID
- 04cc7c5f-383c-4250-a5d0-dd0af70ccc3b
- Published completion target
- July 2026
- Length
- Approximately 28 km
Financing
Lot 6 forms part of The Gambia’s programme of new roads delivered through an EPC structure. The 2026 Citizen Budget allocates GMD1.23 billion to the overall category Engineering, Procurement and Construction Roads (New Roads), which includes several road lots including Lot 6.
That programme-level allocation is not a cost specific to Lot 6. The institutional sources reviewed do not publish a standalone project cost, a financing requirement or a separately itemised secured-financing amount for this lot.
- Public financing
- Included in the national budget programme for new EPC roads
- 2026 programme allocation
- GMD1.23 billion · covers several lots
- Lot 6-specific cost
- Not published
- Financing sought
- Not documented
- Lot 6 secured financing
- Not separately disclosed