Construction Of EPC Roads (Lot 4-Foni Roads Project)
Gambia · Foni Districts, WCR
Transport · Public investment
Project structurePublic investment
Sponsor / contactNRA/ MOTWI
NRA/ MOTWI
Gambia
Description
The nationwide Design & Build LOT 4 road project is in the West Coast Region (Foni Bondali, Foni Jarrol, and Foni Kansala Districts), totaling 20.7 km. It includes Kalagi–Kamangka–Bondali Tenda (10.2 km), Sangajor–Darsilami (5.78 km), and Kanfenda–Tintinba (5.1 km). Roads feature 7 m carriageways, 1.5 m shoulders, drainage, signage, and the project duration is 14 months.
- Status
- Progress 80%
- Last update
- 14 Aug 2026