Description

The nationwide Design & Build LOT 4 road project is in the West Coast Region (Foni Bondali, Foni Jarrol, and Foni Kansala Districts), totaling 20.7 km. It includes Kalagi–Kamangka–Bondali Tenda (10.2 km), Sangajor–Darsilami (5.78 km), and Kanfenda–Tintinba (5.1 km). Roads feature 7 m carriageways, 1.5 m shoulders, drainage, signage, and the project duration is 14 months.

Status
Progress 80%
Last update
14 Aug 2026