Sovereign Project
Batoka Hydro Power Project
Zimbabwe
Energy · Public investment / joint sovereign project
Project structurePublic investment / joint sovereign project
Sponsor / contactGovernment of Zimbabwe
Zimbabwe
Description
Joint Zimbabwe–Zambia hydropower project scheduled to commence during NDS2; Zimbabwe's stated share is 1,200 MW.
- Capacity
- 1200 MW
- Status
- NDS2 public-sector investment pipeline · scheduled to commence 2026–2030
- Last update
- 14 Aug 2026