Sovereign Project
Zambia - Itezhi-Tezhi Hydro Power and Transmission Line Project
Zambia · {'name': 'Mumbwa', 'coordinates': '-14.98293 27.0619'}, {'name': 'Lusaka', 'coordinates': '-15.4067 28.2871'}
Energy sector policy, planning and administration · Public investment / AfDB sovereign financing
ZESCO (Z) LTD
PESD5
Zambia
The Itezhi-Tezhi (ITT) power plant and transmission project consists of the construction, operation and maintenance of a 120 MW base load hydro power plant at the Itezhi-Tezhi (ITT) dam on the Kafue River in Zambia and the transmission line to evacuate the power to the proposed Mumbwa and Lusaka West substations. The Itezhi-Tezhi Hydropower Plant (ITT) part combines a public-private partnership (PPP) clean-energy generation and a public transmission line to evacuate power in Zambia. Concerning the transmission line, it will evacuate power from the ITPC power plant through a 142 km, 220 kV single-circuit line to a new substation at Mumbwa and a 134 km, 330 kV double-circuit line from Mumbwa to Lusaka West substation. The project will bring both local and national benefits through increased access to electricity, jobs, and social services. The project has three components, namely (i) ZESCO’s shareholding in the PPP generation company ITPC; (ii) the transmission line and substations owned by ZESCO that will evacuate the ITPC-generated power; and (iii) technical assistance to ZESCO for an updated cost of service study (COS) and support to negotiating current and future bulk power supply agreements with large consumers.
- Status
- Ongoing
- Last update
- 14 Aug 2026