Sovereign Project

Tanzania - Kakono Hydropower Project

Tanzania · {'name': 'Karagwe District', 'coordinates': '-1.5 31'}, {'name': 'Missenyi', 'coordinates': '-1.12081 31.33607'}

Coal-fired electric power plants · Public investment / AfDB sovereign financing

Estimated cost119m XDR
Financing soughtAfDB sovereign financing approved
Project structurePublic investment / AfDB sovereign financing
Target date2028-12-31
Sponsor / contactTanzania Electric Supply Company Limited (TANESCO)

Tanzania Electric Supply Company Limited (TANESCO)
PESD4

Tanzania

Description

The proposed 87.8-megawatt (MW) Kakono Hydropower Project (HPP) is one of the energy sectoral interventions under the “economic growth” pillar of FYDP III to realize an inclusive and competitive economy by increasing the generation capacity to improve the availability and reliability of electricity supply. The Kakono HPP, together with the ongoing and planned projects in the north-western part of the country, will contribute to increased renewable energy production, thereby displacing the costly diesel generators while, at the same time, improving TANESCO’s financial health. It will also address the deficits of electricity particularly in Kagera, Geita and Mwanza regions in the Lake Zone. Specifically, the Project will complement the Bank-financed Regional Rusumo Falls hydropower transmission line projects and other related Development Partner (DP) operations in the north-western part of the country, thereby contributing to multi-country infrastructure connectivity to promote cross-border power trade. The Project will entail the construction of a concrete-faced rockfill dam (about 42 m high and 1,380 m long) and a gravity roller-compacted concrete dam (about 61 m high and 284 m long) producing a hydropower potential exploited through an outdoor powerhouse at the toe of the dam. The overall Project cost is estimated at USD 308.85 million, including contingencies but excluding local taxes and levies such as overweight road transportation surcharges, etc. This project primarily contributes to climate mitigation results. As such, 100% of the total approved amount is attributed as climate finance, of which 100% is dedicated to mitigation.

Status
Ongoing
Last update
14 Aug 2026
Source
African Development Bank Group · IATI
Actions
Request AccessAccess additional project documents and information. Request IntroductionRequest an introduction to the sponsor or relevant public authority. Country IntelligenceNot available on your current plan.