Morocco - Power Transmission Network Development and Rural Electrification Programme (PDRTE-ER) — Morocco
Morocco · Région du Grand Casablanca, Guelmim · Energy sector policy, planning and administration
Overview
The Power Transmission Network Development and Rural Electrification Programme (PDRTE-ER) is an investment operation. It aims to improve the safety and efficiency of electricity supply in a sustainable development framework. The programme covers the construction and extension of: (i) power lines and substations (VHV and HV) to address current energy transmission constraints and ensure the evacuation of electricity to be generated through the development of additional production capacity, including renewable sources (solar and wind) and power grids (MV/LV) to provide widespread access to power in Moroccan rural areas. It will help to extend the interconnected grid and increase its transmission capacity, ensuring that the energy produced by solar and wind power plants under development or planned for 2020 can be evacuated. In addition, the PDRTE-ER contribute to the strong penetration of renewable and clean energy in the national energy mix, thus mitigating the effects of power generation on climate change, enabling Morocco to meet its national and international commitments in this area. The total cost of the programme is estimated at EUR 352.33 million. It will be carried out over five (5) years from 2020 to 2024. It comprises three components detailed below: (A) Power transmission; (B) Rural electrification; (C) Programme management.
Key project information
- Official name
- Morocco - Power Transmission Network Development and Rural Electrification Programme (PDRTE-ER)
- Status
- Ongoing
- Current phase
- Ongoing
- Country
- Morocco
- Location
- Région du Grand Casablanca, Guelmim
- Sector
- Energy sector policy, planning and administration
- Project structure
- Public investment / AfDB sovereign financing
- Estimated project cost
- XDR 206.6m
- Expected completion
- 2028-12-31