Sovereign Project

Liberia - Renewable Energy for Electrification in Liberia (REEL Project)

Liberia · {'name': 'Nimba County', 'coordinates': '6.75 -8.75'}, {'name': 'Saint John River City District', 'coordinates': '6.0587 -10.03274'}

Energy sector policy, planning and administration · Public investment / AfDB sovereign financing

Estimated cost25.3m XDR
Financing soughtAfDB sovereign financing approved
Project structurePublic investment / AfDB sovereign financing
Target date2027-06-30
Sponsor / contactRural and Renewable Energy Agency

Rural and Renewable Energy Agency
COLR

Liberia

Description

The Renewable Energy for Electrification in Liberia (REEL Project) aims at developing the run-of-river Gbedin Falls HPP with a total capacity of 9.34 MW. The power plant will be located in the St. John River in the Nimba County and will connect to the existing cross-borderline between Liberia and Côte d’Ivoire through an 8km 33kV evacuation line. The project is expected to become a source of reliable, sustainable and affordable power in the region, allow grid expansion to isolated localities and remote areas, and encourage the connection of a larger amount of households, schools, health centers, businesses and industries to the national grid. It will also significantly reduce the number of fossil energy units and increase the electrification rate in Liberia. The project’s total cost is estimated at UA 24.45 million and will be implemented over the 2019-2024 period. The project has three components, namely: (i) Infrastructure, (ii) support for project implementation, and (iii) technical assistance and capacity building.

Status
Ongoing
Last update
14 Aug 2026
Source
African Development Bank Group · IATI
Actions
Request AccessAccess additional project documents and information. Request IntroductionRequest an introduction to the sponsor or relevant public authority. Country IntelligenceNot available on your current plan.