Sovereign Project

Lesotho - Urban Distribution Rehabilitation and Transmission Expansion Project

Lesotho · {'name': 'Mohales Hoek', 'coordinates': '-30.15137 27.47691'}, {'name': 'Butha Buthe', 'coordinates': '-28.76659 28.24937'}

Energy sector policy, planning and administration · Public investment / AfDB sovereign financing

Estimated cost7.8m XDR
Financing soughtAfDB sovereign financing approved
Project structurePublic investment / AfDB sovereign financing
Target date2027-12-31
Sponsor / contactMinistry of finance

Ministry of finance
PESD5

Lesotho

Description

The Urban Distribution Rehabilitation and Transmission Expansion Project is part of the medium-term energy sector investment program approved by the Government of Lesotho for the period 2016-2020. It aims to improve the reliability and quality of electricity supply to customers. The proposed intervention focuses on expanding access, rehabilitation and improvement of the electricity supply system. The improvement in the reliability and availability of the distribution network is to be achieved through rehabilitation of existing electricity supply switching stations, primarily in the municipality of Maseru, rehabilitation of some 33 kV lines, substation upgrade and construction of a 132 kV line to augment supply. The project will also conduct an electricity cost-of-service study and preparation of an energy resources map. Its implementation will allow to renovate and strengthen the electricity distribution network, which will lead to positive impacts on power losses and power cuts, which will reduce their impact by 2% and 25% (resp.), With to the key a network availability up 5%.

Status
Ongoing
Last update
14 Aug 2026
Source
African Development Bank Group · IATI