The Government of Kenya is preparing a liquefied-natural-gas-fired power plant at Dongo Kundu in Mombasa. The project under study provides for final capacity of up to 1,200 MW, developed in phases, together with the infrastructure required to import and deliver LNG.
The project is being considered as a public-private partnership under a potential Build, Own and Operate or Build, Own, Operate and Transfer structure. The scope under study includes the generating plant, LNG-import infrastructure potentially incorporating a floating storage and regasification unit, marine facilities and associated pipelines.
The Project Concept Note was approved in March 2026, allowing the project to move to feasibility study. A competitive process was then launched to recruit a transaction adviser to update the feasibility study, review PPP structuring and support preparation through financial close. The PPP Directorate now marks that procurement process as closed.
Key project information
- Official name
- Liquefied Natural Gas Fired Power Plant at Dongo Kundu
- Status
- Preparation / feasibility study
- Current phase
- Project structuring and feasibility-study preparation
- Country
- Kenya
- Location
- Dongo Kundu · Mombasa
- Sector
- Energy
- Sub-sector
- Liquefied-natural-gas power generation
- Project structure
- Proposed PPP · BOO or BOOT
- RicherFin project ID
- 0119312c-8bcd-4264-a902-ca0a0539b3c8
- Planned capacity
- Up to 1,200 MW
- Estimated project cost
- Not published in the verified institutional documents
- Initial approval
- March 2026 · Project Concept Note
- Expected completion
- Not documented
Financing
The project is proposed as a PPP, but the verified public institutional sources do not yet publish an official investment cost for the current project, debt or equity amounts, secured financing or a definitive financing requirement.
Financial structuring forms part of the transaction adviser's mandate. The terms of reference include updating the feasibility study, examining possible project structures and supporting preparation through financial close.
- Financing structure
- PPP · final structure to be determined
- Financial close
- Not reached / not documented
- Financing status
- Structuring in progress