RicherFin · Sovereign Projects
Franceville Road Rehabilitation — Phase 3 — Gabon
Gabon · Franceville, Haut-Ogooué Province · Road transport
Overview
The Franceville Road Rehabilitation — Phase 3 project covers the upgrading of the urban road network in Franceville, capital of Haut-Ogooué Province. Available technical documents describe road-rehabilitation works across the city's four districts, covering a reported total length of 12.899 km.
In May 2024, the project was included in a memorandum of understanding and partnership between the Gabonese state and Colas, signed during the Gabon-France Economic Forum. The memorandum jointly covered Phase III of the Franceville roads and the Bifoun-Lambaréné corridor for a reported aggregate amount of FCFA 76 billion.
The 2026 Finance Act separately provides for FCFA 5 billion of drawdowns for the Franceville Road Rehabilitation, Phase 3. This amount is a budgeted 2026 drawdown and must not be treated as the project's total cost.
Key project information
- Official name
- Franceville Road Rehabilitation, Phase 3
- Status
- Financing included in the 2026 Finance Act
- Current phase
- Implementation / financing
- Country
- Gabon
- Location
- Franceville, Haut-Ogooué Province
- Sector
- Road transport
- Sub-sector
- Urban roads
- Project structure
- Public road-infrastructure project
- RicherFin project ID
- 00ac3a12-e67c-4d17-9ef2-6e5c34bf8a49
- 2026 financing identified
- FCFA 5 billion
- Documented scope
- 12.899 km of roads across Franceville's four districts
- Partnership memorandum
- May 2024
Financing
The latest identified public financing appears in Gabon's 2026 Finance Act, which provides for an FCFA 5 billion drawdown for the Franceville Road Rehabilitation, Phase 3. The project is listed in the schedule of drawdowns under project-loan agreements.
This amount is not an estimate of the project's total cost. A memorandum signed in 2024 covered an aggregate envelope of FCFA 76 billion, but this combined two separate operations: the Franceville roads Phase III and the Bifoun-Lambaréné corridor. The institutional sources reviewed do not provide an official allocation between the two projects.
- 2026 financing identified
- FCFA 5 billion
- Nature
- Drawdown scheduled under the 2026 Finance Act
- Total project cost
- Not established by a sufficiently precise institutional source
- Capital sought
- Not documented
- Financing gap
- Not documented