Sovereign Project
Côte d'Ivoire - Abidjan Urban Transport Project-Phase 2
Côte d’Ivoire · {'name': 'Département d’Abidjan', 'coordinates': '5.41667 -4.03333'}, {'name': 'Abidjan', 'coordinates': '5.30966 -4.01266'}
Public transport services · Public investment / AfDB sovereign financing
Ministère des infrastructures économiques
PICU
Côte d’Ivoire
This intervention concerns second phase, for EUR 329.47 million (UA 261.49 million), which covers all remaining activities of the Abidjan Urban Transport Project (PTUA). The first tranche of the Bank loan was approved in December 2016 to finance the work of the 4th Abidjan Bridge - connecting Yopougon to the Plateau. This complementary loan will make it possible to transform 88 km of roads threatened with saturation into urban highways, thus doubling the flow capacity of the traffic. Are concerned, the roads of Dabou (section between Yopougon and the junction of Jacqueville), west of Abidjan, and Adzopé (between Yopougon and Thomasset), north. The Abidjan ring road called "Y4 ring road" (northern section) will also be developed, the Latrille boulevard will be extended and split, the traffic lights of 90 intersections will be rehabilitated and an intelligent traffic control system will be installed.
- Status
- Ongoing
- Last update
- 14 Aug 2026