Sovereign Project

Congo - Development studies for hydroelectric sites and associated lines

Republic of Congo · {'name': 'Brazzaville', 'coordinates': '-4.26613 15.28318'}

Energy sector policy, planning and administration · Public investment / AfDB sovereign financing

Estimated cost450k XDR
Financing soughtAfDB sovereign financing approved
Project structurePublic investment / AfDB sovereign financing
Target date2026-10-31
Sponsor / contactMinistère de l'Énergie

Ministère de l'Énergie
RDGC

Republic of Congo

Description

The Feasibility Study Project for Hydroelectric Developments in Congo follows a request (Ref. No. 322-24 dated July 11, 2024) from the Government of Congo seeking the Bank’s support for the feasibility study of hydroelectric developments at six (6) sites along the Congo River. The project aligns with the Congo’s National Development Plan (NDP 2022–2026). This study aims to prepare future electricity generation projects, thereby contributing to the increase in Congo’s electricity production capacity. It will also incorporate environmental and social studies, as well as gender considerations. The project consists of three (03) components: i) Detailed design study of the hydroelectric developments, including energy evacuation infrastructure, access road studies, and climate change vulnerability analysis; ii) Environmental and social studies, along with a detailed gender analysis; and iii) Project management (audit and operations). The project is financed by a FAT-PRI grant of four hundred and fifty thousand Units of Account (UA 450,000) for conducting the feasibility study of hydroelectric developments at two (2) sites. The planned duration for these studies is eighteen (18) months.

Status
Approved
Last update
14 Aug 2026
Source
African Development Bank Group · IATI