Sovereign Project
Moila Mougue hydroelectric development
Cameroon · Sud
Energy · Concession
Estimated cost1 300bn XAF
Project structureConcession
Sponsor / contactMINEE
MINEE
Cameroon
Description
Hydropower plant on the Ntem basin.
- Capacity
- 420 MW
- Status
- To be verified
- Last update
- 14 Aug 2026