RicherFin · Sovereign Projects
Climate-Resilient Water and Sanitation Studies Project (PEA-CR) — Burkina Faso
Burkina Faso · Multiple regions and secondary cities · Water and sanitation
Overview
The Climate-Resilient Water and Sanitation Studies Project (PEA-CR) is a sovereign investment-preparation operation designed to produce the technical, environmental, social and procurement studies required for future drinking-water and sanitation investments in Burkina Faso. It notably prepares water-production centres and faecal-sludge treatment plants in several secondary cities.
The programme includes feasibility, preliminary and detailed-design studies, environmental and social assessments, hydraulic models and tender-document preparation. Explicitly documented operations include the Samendéni water-production centre in Hauts-Bassins, the Dapola water-production centre in Sud-Ouest and four faecal-sludge treatment plants in Kaya, Kongoussi, Ziniaré and Pô.
The latest African Development Bank implementation report identified is dated 6 June 2026, following a field mission from 20 to 22 May 2026. The project therefore remains in implementation and preparatory-study delivery.
Key project information
- Official name
- Climate-Resilient Water and Sanitation Studies Project (PEA-CR)
- Status
- Ongoing
- Current phase
- Preparatory studies and implementation
- Country
- Burkina Faso
- Location
- Multiple regions and secondary cities, including Hauts-Bassins, Sud-Ouest, Kaya, Kongoussi, Ziniaré and Pô
- Sector
- Water and sanitation
- Sub-sector
- Drinking-water supply, sanitation and climate-resilient infrastructure preparation
- Project structure
- Public investment · ADF Project Preparation Facility
- AfDB project ID
- P-BF-E00-021
- RicherFin project ID
- 02d1045e-5ac1-48cd-86a3-871c1a23fba4
- Documented total cost
- UA 2,714,628
- Financing secured
- UA 2,714,628
- Approval
- 08 Feb 2024
- Currently recorded target date
- 30 Apr 2027
Financing
The June 2026 implementation report establishes a total cost of UA 2,714,628. The African Development Fund Project Preparation Facility finances UA 2,177,905 and Burkina Faso's public contribution amounts to UA 536,723. The documented financing plan therefore covers the full stated cost.
No additional financing requirement or documented financing gap is reported in the source material.
- Total project cost
- UA 2,714,628
- Financing secured
- UA 2,714,628
- ADF Project Preparation Facility
- UA 2,177,905
- Government of Burkina Faso contribution
- UA 536,723
- Financing sought
- No additional financing documented
Continue to project details
Sign in to continue with the complete project information.
Sign in to continue