Dogo-Bis, Vossa and Bétérou Multipurpose Dams on the Ouémé River — Benin

Alternative / official name: Construction of the Dogo-Bis, Vossa and Bétérou multipurpose dams on the Ouémé River — historical programme of 203 MW

Benin · Ouémé River basin · Energy

Overview

The project entered Benin’s official public-private partnership portfolio in 2018 as a group of three multipurpose dams on the Ouémé River: Dogo-Bis, Vossa and Bétérou. The 2018 catalogue attributed 128 MW, 60.2 MW and 14.8 MW respectively to the three sites, for an announced combined capacity of 203 MW. Their intended functions combined hydropower generation and irrigation.

The three developments are no longer documented as a single 203 MW investment with common financing. Recent institutional sources track them separately. Dogo-Bis is being developed through a World Bank-supported multiphase programme, while the Benin Electricity Production Company continues to list Vossa and Bétérou among its ongoing hydropower projects.

The first Dogo-Bis phase financed in 2026 does not fund construction of the main dam. It prepares the investment through technical, environmental, social, economic, financial, legal and commercial studies, priority socioeconomic infrastructure around the site and capacity building required for the later dam investment.

Key project information

Historical official name
Construction of multipurpose dams on the Ouémé River at Dogo-Bis, Vossa and Bétérou
Current status
Development by component
Documented current phase
Dogo-Bis Phase 1 preparation and associated infrastructure; Vossa and Bétérou listed as ongoing by SBPE
Country
Benin
Location
Ouémé River basin
Sector
Energy
Sub-sector
Hydropower · irrigation · water-resource management
Project structure
Originally proposed as a PPP programme; current structuring differs by site
RicherFin project ID
0051d4e3-f432-4bd1-a85f-b8035fa86425
World Bank ID — Dogo-Bis Phase 1
P513979
Current consolidated cost
Not published
Documented secured financing
US$150 million for Dogo-Bis Phase 1
Dogo-Bis Phase 1 approval
16 Jun 2026
Consolidated completion date
Not documented

Financing

No updated and verifiable total cost is published for the combined Dogo-Bis, Vossa and Bétérou developments. Financing must therefore be considered separately by component.

In June 2026, the World Bank approved a US$150 million International Development Association credit for Dogo-Bis Phase 1. This amount fully finances the preparatory phase, not construction of the main dam. It covers investment studies, site-access infrastructure, rural electrification, selected social infrastructure, environmental and social measures and institutional capacity building.

Secured financing — Dogo-Bis Phase 1
US$150 million
Instrument
IDA credit
Phase 1 financing gap
US$0
Main dam construction financing
Not documented as secured
Vossa financing
Not documented in the recent institutional sources reviewed